Callahan & Freeman’s schematic design for a preparatory school gymnasium includes a stand-alone facility carved into a sloping hillside on the school campus. The main entry vestibule establishes flow through the lobby containing concessions into the gymnasium where telescoping bleachers seat 320 spectators. Locker rooms are adjacent to the taller volume gymnasium with classroom and office functions orbiting at the rear of the facility, tucked into the hill. An outdoor plaza helps transition the sloping topography.